SECTION 15010 - GENERAL REQUIREMENTS FOR MECHANICAL SYSTEMS


1.17 EQUIPMENT FOUNDATIONS  & CURBS


a)  Provide equipment foundations and curbs associated with the work in accordance with the provisions of these specifications.

 

b) In the event concrete pad  does not exist at the installation location of the HVAC equipment, provide concrete pad and bases for all pad or floor mounted equipment. Bases shall be four inches (4") high above finished floors or grades (unless otherwise noted) and shall protrude two inches (2") beyond all sides of equipment and shall have exposed chamfered edges. Construct bases from ready-mixed hardrock concrete, ASTM C94, reinforced with #3 rebars, ASTM A615, Grade 40, at 18" on center each way.

 

c) Field verify exact location of outdoor pad mounted equipment with the Construction Manager. Supply necessary fill and grade site to provide natural drainage away from equipment.