Radha Krishna Temple Kitchen Expansion Project

Waheed Consulting


SECTION 15010 - GENERAL REQUIREMENTS FOR MECHANICAL SYSTEMS

 1.13 CONSTRUCTION REQUIREMENTS


 
a) The drawings show the arrangements of work. Should project conditions necessitate rearrangement, or if the materials or equipment can be installed to a better advantage in a different manner, the Contractor shall, before proceeding with the work, prepare and submit five copies of Drawings of the proposed arrangement for the Architect’s review. Allow a minimum of ten (10) working days for review.

 

b) Should the Contractor propose to install equipment requiring space conditions other than those shown, or rearrange the equipment, he shall assume responsibility for the rearrangement of the space and shall have the Architect review the change before proceeding with the work. The request for such changes shall be accompanied by shop drawings of the space in question. Identify monetary credits proposed or other benefits of the change. Allow a minimum of ten (10) working days for review.

 

c) The Contractor shall be responsible for the proper location and size of all slots, holes or openings in the building structure pertaining to his work and for the correct location of pipe sleeves.