SCOPE

This section includes commissioning forms for construction verification and functional performance testing. Included are the following topics:

 

PART 1 - GENERAL

Scope

Related Work

Reference

Submittals

PART 2 - PRODUCTS

(Not Used)

PART 3 - EXECUTION

DO NOT INCLUDE ANY COMMISSIONING FORMS for PRELIMINARY review. Just edit the list below and only submit pages 21 08 00-1 through 21 08 00-2 with strikethroughs.

Commissioning Forms

CV-21 10 00        Air Compressor

CV-21 10 00        Water Based Fire Suppression System

CV-21 30 00        Fire and Pressure Booster Pumps


REFERENCE

Applicable provisions of Division 1 shall govern work under this section.

 

SUBMITTALS

Reference the General Conditions of the Contract for submittal requirements.

 

P A R T  2  – P RO D U C T S

(Not Used)

 

P A R T  3  –  E X E C U T I O N

 

COMMISSIONING FORMS

Commissioning forms are to be filled in as work progresses by the individuals responsible for installation and shall be completed for each installation phase.

 Provide a description of the work completed since the last entry, the percentage of the total work completed for the system for that area and the step of installation or finalization.

Circle Yes or No for each commissioning form item. If the information requested for an item does not apply to the given stage of installation for the system, list it as “N/A”. Explain all discrepancies, negative responses or N/A responses in the negative responses section.

Once the work is 100% complete and the responses to each item are complete and resolved for a given commissioning forms group, mark as complete, initial and date in the spaces provided.

Provide copies of the commissioning forms to the commissioning agent 2 days prior to construction progress meetings.